Call Us : 804-561-2659

Email : Roger@RBMremodels.com

4
Apr

Here are a few photos of the completed exterior for this 24 x 28 detached garage in Henrico.

The upstairs space boasts a spacious 14′ x 27′ space including a full bath and is and ready to move furniture in.

Downstairs the new 10,000lb car lift has been installed and is ready for cars and tools to be moved in as well.

The exterior has a matching brick foundation with prefinished Hardiplank cement siding.

A new driveway was installed as part of this project.

Check out the interior photos on our post from 3/09/2012.

Contact us for a free estimate on your next remodeling project.

Photo of completed garage with new driveway

Another photo of completed garage

Category : Garage | Remodeling | Blog
9
Mar

Here are a few photos of the completed interior for this 24 x 28 detached garage in Henrico.

The upstairs space boasts a spacious 14′ x 27′ space including a full bath and is and ready to move furniture in.

Downstairs the new 10,000 car lift has been installed and is ready for cars and tools to be moved in as well.

We will be posting the final photos of the exterior soon as we are finishing the final touches.

Contact us for a free estimate on your next remodeling project.

Interior photo of new room above garage

Interior of bonus room looking toward bathroom

Interior picture of dormer and knee wall storage space

Vanity and toilet are in upstairs of new garage

View of stand up 4' shower

Photo of garage downstairs with new car lift installed

Category : Garage | Remodeling | Blog
8
Feb

Below are some recent installation photos of new garage with living space in Henrico.

After insulating we are now applying sheetrock to all walls and ceilings in both the upstairs and downstairs.

The upstairs sheetrock is 1/2″ thick and the downstairs boards that adjoins living space must be a fire rated for at least a hour.

Other photos of this garage addition are on previous post or you can just ask us for more information.

Feel free to contact us for a free estimate on your next remodeling project.

View of upstairs space looking toward bathroom and dormer

Sheetrock being installed in garage

Category : Garage | Remodeling | Blog
3
Feb

Here are a few new photos of cement siding being installed on a 24′ x 28′ garage and 10′ x 10′ shed in Henrico Co.

The siding that we are using a 6″ smooth beaded primed cement based siding manufactured by Hardi plank.

All of the cornice work for the garage and shed is PVC boards that are the shape of wood including crown moulding.

These products all have the appearance of wood and the durability of vinyl.

The landing and stairs to the 2nd floor are all pressure treated.

All fasteners for the landing and railings utilize hot dipped galvanized fasteners.

New garage has siding and new landing for access to upstairs

We will be featuring more  posts on this and other projects so check back soon.

Contact us with any questions that you may have.

Category : Deck | Garage | siding and trim | Blog
25
Jan

Here is another photo of a new garage with accent shed near Parham Rd and Patterson Ave.

Roof is completed and trades are working inside

The roofing for the garage includes Certainteed dimensional shingles were installed.

All of our roofing systems include Ice and water shield at overhangs  as well as valleys, ridge vent, new pipe collars and flashing.

We will be featuring more  posts on this and other projects so check back soon.

Contact us with any questions that you may have.

Category : Garage | roofing | Blog
23
Jan

Here is another photo of a new garage with accent shed near Parham Rd and Patterson Ave.

Framing for this garage includes a 12′ ceiling height for a future car lift.

The roof pitch is a 12/12 with a 10′ double dormer. All eave areas will have storage space that will be insulated.

Upstairs in this garage will be a finished space that will have a full bathroom and a spacious 14′ x 20′ common area.

We will be featuring more  posts on this and other projects so check back soon.

Contact us for a free consultation for your next remodeling project.

Photo of garage framing completed and dimensional shingles started

Category : Garage | Blog
19
Jan

Here are a few more photos of a new garage near Parham Rd and Patterson Ave.

Framing for this garage includes a 12′ ceiling height for a future car lift.

The floor system for the upstairs utilizes 16″ TJI engineered I beams for a clear span in the garage area.

Rafters are 2 x 10 to accommodate R-38 insulation for the finished living space above this garage.

We will be featuring more  posts on this and other projects so check back soon.

Contact us for a free consultation for your next remodeling project.

Garage walls are framed and floor joist are in place for 2nd floor

Roof framing is underway with front dormer

Category : Garage | Blog
17
Jan

Here are a few photos of a new garage near Parham Rd and Patterson Ave.

The slab has a 4″ base of compacted stone with exterior expansion joints and has a 6 mil vapor barrier installed.

Framing for this garage includes a 12′ ceiling height for a future car lift.

There will also be finished living space above this garage.

We will be featuring more framing progress posts so check back soon.

Contact us for a free consultation for your next remodeling project.

Slab is prepped and rear wall is being framed

Photo of 3rd wall being stood up

Category : Garage | Blog
11
Jan

Here are a few pictures of progress and completed foundation for a new 24 x 28 garage off of Forest Ave in Henrico Co.

The  footings were dug to a depth of  18″-36″ and at a 20″ width.

In the trench for the concrete we placed 3000 psi ready mixed concrete.

The concrete for the footings are a minimum of 8″ thick and are stepped for sloping grades.

The foundation has 10″ base block with a 6″ block above grade and a brick veneer.

Brick to match the home is manufactured by Cunningham over sized brick and C81 mortar is Type S from Flamingo.

The slab has a 4″ base of compacted stone with exterior expansion joints and has a 6 mil vapor barrier installed.

Due to the slab height being lower than the outside grade we had to water proof the foundation.

Waterproofing includes molten tar, gravel, silt fabrics and drain tile.

Next we will install the framing so check back soon.

Contact us for a free consultation for your next remodeling project.

Progress photo of new garage foundation

Photo of drain tile being installed and back filling

Photo of completed foundation

Category : Garage | Blog
9
Jan

Here is a photo of the completed staining on a detached garage that we are putting the final touches on near Genito Rd.

Beveled Cedar siding was installed on the front and sides of the dormer.

All cornice trim work is cedar and AC plywood.

The stain and paint we used is manufactured by Duron Coatings.

Photo of completed exterior on new garage

Please feel free to ask us any questions that we do not address in our posts.

Category : Garage | Uncategorized | Blog